Juniper
Satellite imagery of the Cedar Valley west of Cedar City, with Avon, Enoch and Cedar City labeled
Public information · Pre-application

A rail-served industrial campus,Minutes From I-15

About 830 acres of private land west of Cedar City, bisected by the Union Pacific Cedar City line. Planned for a mix of industry, not a single use. The developer is E3 Platforms. Nothing has been approved.

Rail on site
Union Pacific Cedar City line
Power on site
Behind the meter, not from the grid
Under 200 AF/yr
Water, through the district
830 acres
Phase 1, private land
Satellite imagery of the Cedar Valley, with the nearby communities of Avon, Enoch and Cedar City labeled. Not a rendering of the proposed campus.
What Is Proposed

A Mix of Industry, Not One Use

The site has direct Union Pacific rail service, on-campus power generation, natural gas, water supplied through the Cedar Valley Water Conservancy District, and fiber. It is planned for advanced manufacturing, rail-served logistics, processing and industrial agriculture, with data centers as one possible use among them. Any approval would come from Iron County under the zoning framework the county is now writing.

What Could Be Built Here

The kinds of operation the campus is being marketed to. Which of them actually locate here depends on who signs a lease and what Iron County approves.

Rail-Served Industrial and Logistics

Direct adjacency to the Union Pacific line, with yard and circulation capacity for multiple rail users in Phase 1. Rail-served sites reduce transportation costs and emissions.

Typical users

Bulk commodity processors · Transload and distribution operators · Energy and materials logistics

Advanced Manufacturing

A balanced load, not the extremes of AI compute or heavy industry. Consistent power quality for precision processes, with fiber, water and gas already integrated.

Typical users

Semiconductor and electronics · Robotics and automation · Precision component manufacturing

Agri-Industrial

Land, water and power co-located for high-volume production and processing, with flexible layouts and room to expand.

Typical users

Food processing and packaging · Fertilizer and input production · Controlled environment agriculture

Heavy Power Industrial

Baseload power aligned with continuous operations, scaling from 100-megawatt blocks, with co-located generation and fuel supply.

Typical users

Hydrogen and e-fuels production · Battery manufacturing · Metals and chemical processing

Data Centers

One possible use among the others, drawing on the same on-site generation and fiber as the rest of the campus rather than on the community's supply.

Typical users

Colocation platforms · Cloud and compute operators

The Full Detail

Each of these has a published one-page summary. All of them are in the presentation.

Read the Presentation
Conceptual illustration of a master-planned industrial campus in a high desert valley, with a solar array and rail line
Location

Where It Is, and What It Is Near

The site has direct access to major transportation routes and sits within a day's drive of several Western markets.

Conceptual image. An illustration of how a campus of this kind could be laid out. It is not a photograph, not an approved plan, and not a rendering of anything that has been built.
Location
AddressLivestock Land, Iron County, UT 84721
Coordinates37°52'05"N 113°20'24"W
CountyIron County
Distance to Major Cities
Salt Lake City, UT275 miles
Las Vegas, NV189 miles
Phoenix, AZ455 miles
Los Angeles, CA456 miles
Transportation
Municipal airport, Cedar City28.7 miles
Regional airport, St. George76.7 miles
Major highwayI-15 access
RailDirect rail access
The Site Plan

How the Land Is Laid Out

West of Cedar City in unincorporated Iron County, on private land bisected by the Union Pacific Cedar City line. An additional 2,000-plus acres adjacent to Phase 1 is identified for possible later expansion.

Acreage by use, per sheet C1.0
Power generation area203 acres
Rail serve area116 acres
Water treatment area41.3 acres
Stormwater detention (basin 1)2.87 acres
Stormwater detention (basin 2)7.1 acres
Data center area396 acres

From site plan sheet C1.0, "Existing Conditions Exhibit." This drawing shows existing site conditions and the proposed land-use areas; it is not an approved plan.

Site plan drawing showing the property line, existing easements, the Union Pacific Railroad alignment, and proposed land-use areas: power generation, rail serve, water treatment, stormwater detention, and data center
The site plan, from sheet C1.0 "Existing Conditions Exhibit": the property line, easements, the Union Pacific Railroad, and the proposed power generation, rail serve, water treatment, stormwater detention, and data center areas. Acreages at left are read directly from this drawing.
What People Ask First

Short answers. The detail behind each one is in the presentation.

How much water would it use?

Under 200 acre-feet a year at full Phase 1 buildout. Cooling is dry and closed-loop rather than evaporative. Supply comes through the Cedar Valley Water Conservancy District's allocation, and the developer is buying water rights to contribute to the district and cost-sharing about 15 percent of the Pine Valley Project, which would bring 15,000 acre-feet into the Cedar Valley.

Would it raise my power bill?

The campus is designed to generate its own power on site and deliver it behind the meter through a private infrastructure district, so it does not draw on the community's existing supply. Transmission and distribution built for the campus is paid for by the project, not by ratepayers.

What would I see and hear?

The site is west of Cedar City, away from residential neighborhoods, inside the strategic development zone the county is defining. Building heights, lighting, noise limits and setbacks would be written into a development agreement with Iron County and enforceable by the county.

What does the county get?

A multi-year construction workforce, then permanent jobs spread across several industries rather than one. Roads, water lines and other infrastructure built by the project would be deeded to Iron County and the water district. The county would take on no debt for it.

Map of the Utah rail network showing the Cedar City line and connections to Salt Lake City and Las Vegas

Where the Project Stands

Iron County adopted a short-term development moratorium in 2026 to write a governance framework for large industrial development. A zoning application, a development agreement, and public hearings would all come after it.

See the Full Timeline
The Utah rail network. The site is served by the Union Pacific Cedar City line, which connects north to Salt Lake City and south toward Las Vegas.

Have a Question About the Project?

Send it to the project team. Questions asked often are answered publicly on the Community Questions page.

Open the Comment Form